![Ansul CHECKFIRE 110 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/ansul/checkfire-110/checkfire-110_planning-installation-operation-and-maintenance-manual_2946332030.webp)
SECTION 4 – SYSTEM PLANNING
PAGE 4-8 rEV. 0 2014-APr-30
COMPONENTS PLANNING CHECKLIST
h
CHECKFIrE 110 Control Module
h
Mounting Bracket
h
Detection Circuit Cable(s), Tees, EOl Device, and Branch
Terminator(s)
h
Electric Manual Actuator(s) (EMA) and Bracket(s)
h
Linear Detector(s)
h
spot Thermal Detector(s) (include bracket and heat shield),
if applicable
h
release Circuit Cable(s) and Tees
h
Release Circuit Drop Cable(s)
h
PAD(s)
h
Electric-Pneumatic Actuator(s) (may be supplied with agent
tanks)
h
Pneumatic Manual Actuator(s) (optional)
h
Power Circuit Cable(s) and Fused Power Circuit Cable
h
Pressure switch(es), if applicable
h
rubber-Coated 5/16 in. (8 mm) P-Clamps (by others)
h
Double-loop Cable Ties
h
Bulkhead Feedthrough Connectors (detection, release, and
power circuits)
h
Alarms or Strobes
h
Label Package
Note:
For part numbers, see section 10 – Appendix,
Component Index, page 10-1.
CHECKFIRE 110
Detection and Actuation System
Содержание CHECKFIRE 110
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 01 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 22: ...SECTION 3 USER INTERFACE PAGE 3 4 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 68: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 84: ...SECTION 9 TROUBLESHOOTING PAGE 9 10 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...