Operator’s Manual
pg. 50
Rev 9/20/18
11.4
Press the check mark (
) button on the Touch Screen Display. One of the following screens will be displayed.
After you confirm that the DE is added, the Clamp Bar D button on the Control
Panel is disabled until the SDF process completes.
12.
Install IDF
Flow-thru
bags on the ANKOM
TDF
Dietary Fiber Analyzer.
12.1
Gently pull the black IDF Delivery Nozzle out toward you.
12.2
Place a labeled IDF
Flow-Thru
bag up underneath the Delivery Nozzle so that the Delivery Nozzle is inside the
top part of the bag. Pull the bag up so that the top of the bag is about 35 mm (1.375 inches) above the top of
Clamp Bar A and return the Delivery Nozzle to its original position. This will hold the back of the bag in place.
12.3
With the bag held by the Delivery Nozzle, center it horizontally between the Centering Lines on the back part of
Clamp Bar A.
For proper mixing during the IDF process the IDF
Flow-thru
bags must be
horizontally centered over the Heating Paddles and between the Centering Lines on
the back part of Clamp Bar A.
←
IDF
Flow-Thru
Bags (and clamp bar B) installed?
AOAC
2001.03
TDF
←
IDF
Flow-Thru
Bags (and clamp bar B) installed?
AOAC
985.29
TDF
Centering Lines
Heating Paddle
Содержание HS
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 44: ...Operator s Manual pg 44 Rev 9 20 18 This page intentionally left blank ...
Страница 70: ...Operator s Manual pg 70 Rev 9 20 18 This page intentionally left blank ...
Страница 80: ...Operator s Manual pg 80 Rev 9 20 18 This page intentionally left blank ...