Operator’s Manual
pg. 24
Rev 9/20/18
13.2
Rinse the tin with no more than 3 ml of Distilled Water to ensure complete transfer.
13.3
Repeat steps 13.1 – 13.2 for all IDF stations.
13.4
Re-install Clamp Bar A by setting it on the locator rods. Make sure the letter is on the top of the bar and the
rubber material is facing in toward the instrument.
13.5
Press the check mark (
) button on the Touch Screen Display. The following screen will be displayed.
13.6
Make sure that all clamp bars are installed with the letter on the top of the bar and the rubber material facing in
toward the instrument. Press the check mark (
) button on the Touch Screen Display. The following screen will
be displayed.
14.
Hook the front of each SDF bag in place.
14.1
Secure the SDF filter bags in place with the hooks located on the front part of Clamp Bar C.
Hooking the bags in place will put a physical hole in the front of each SDF bag.
14.2
Press the check mark (
) button on the Touch Screen Display. If you ran a method other than 991.43 prior to this
run, the following screen will be displayed.
Front of SDF Bags hooked to clamp bar C?
←
AOAC
991.43
IDF/SDF
All remaining clamp bars installed?
←
AOAC
991.43
IDF/SDF
Hook on front part of
Clamp Bar C
Содержание HS
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 44: ...Operator s Manual pg 44 Rev 9 20 18 This page intentionally left blank ...
Страница 70: ...Operator s Manual pg 70 Rev 9 20 18 This page intentionally left blank ...
Страница 80: ...Operator s Manual pg 80 Rev 9 20 18 This page intentionally left blank ...