Operator’s Manual
Rev 9/20/18
pg. 55
20.
Start the instrument.
The instrument is now completely set up and ready to automatically run the TDF procedure. Press the
START
button to
begin. At the beginning of each new run, the instrument automatically runs a tube integrity test.
For the first run after a power-up cycle, or for the first run after the instrument has been idle for twelve hours, the
following screen will be displayed.
If the fluid lines are already charged properly, or when the line charge is complete, the following screen will be displayed.
When the tube integrity check is complete, the instrument will automatically execute the TDF procedure stopping only for
faults, aborts, and manual pH adjustment. The Status screen will show actions and faults as they occur during the
automatic operation.
Testing pump tubing.
Please wait..........
Initializing lines…
Amylase
EtOH78
Protease
EtOH95
AMG
Water
HCL
Buffer
Vacuum xx.x
cur: - x.x
max: - x.x
AOAC
2001.03
TDF
←
START
Press START to begin
AOAC
985.29
TDF
←
START
Press START to begin
Содержание HS
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 44: ...Operator s Manual pg 44 Rev 9 20 18 This page intentionally left blank ...
Страница 70: ...Operator s Manual pg 70 Rev 9 20 18 This page intentionally left blank ...
Страница 80: ...Operator s Manual pg 80 Rev 9 20 18 This page intentionally left blank ...