6.
Install extra plastic containers under all six IDF Delivery Nozzles to catch any fluid currently in the lines.
With containers in place, press the
OK
button. After fluid empties into the containers, the following screen will be
displayed.
7.
Remove the containers with fluid.
8.
Install the empty pre-weighed beakers under all six IDF Delivery Nozzles and press the
OK
button.
While the fluids are being delivered, the following screen will be displayed.
←
Place Calibration containers under
the IDF Delivery Nozzles.
Press OK when done.
OK
Volume Calibration
Содержание HS
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 44: ...Operator s Manual pg 44 Rev 9 20 18 This page intentionally left blank ...
Страница 70: ...Operator s Manual pg 70 Rev 9 20 18 This page intentionally left blank ...
Страница 80: ...Operator s Manual pg 80 Rev 9 20 18 This page intentionally left blank ...