
AMETEK CTS
OCS 500 N6 series
Manual for Operation
V 5.24
53 / 80
Iteration of the standard test procedure as per IEC 61000-4-12
The ring wave has to be applied
synchronized to the voltage phase at
the respective angle and the peak
value of the ac. voltage wave (positive
and negative).
The ring wave has to be applied
between lines and between line(s) and
earth. When testing line to earth the
test voltage has to be applied
successively between each of the lines
and earth.
The test voltage has to be increased
by steps from the lowest test level up
to the test level specified in the product
standard or test plan.
List of settings EN 61000-4-12
(each setting with 5 pulses)
Setting Voltage
Coupling
Polarity
Phase angle
Setting Voltage
Coupling
Polarity
Phase angle
1
2
3
4
500
L-N
neg.
0
90
180
270
37
38
39
40
1000
L-PE
post
0
90
180
270
5
6
7
8
post
0
90
180
270
41
42
43
44
N-PE
neg
0
90
180
270
9
10
11
12
L-PE
neg
0
90
180
270
45
46
47
48
post
0
90
180
270
13
14
15
16
post
0
90
180
270
49
50
51
52
2000
L-N
neg
0
90
180
270
17
18
19
20
N-PE
neg
0
90
180
270
53
53
55
56
post
0
90
180
270
21
22
23
24
post
0
90
180
270
57
58
59
60
L-PE
neg
0
90
180
270
25
26
27
28
1000
L-N
neg
0
90
180
270
61
62
63
64
post
0
90
180
270
29
30
31
32
post
0
90
180
270
65
66
67
68
N-PE
neg
0
90
180
270
33
34
35
36
L-PE
neg
0
90
180
270
69
70
71
72
post
0
90
180
270
Example for Level 3
Содержание OCS 500 M6
Страница 76: ......
Страница 77: ...AMETEK CTS OCS 500 N6 series Manual for Operation V 5 22 77 80 12 2 OCS 500 N6 General Diagram ...