
1. Installation Place
39
ML-2350A/2351A
Chapter 1 Installation Place
Introduction Part
Operating Part
Maintenance Part
Appendixes
Installation
and
Preparation
Part
Chapter 1
●
Installation
This chapter explains where to install the laser welder, how to fix it, and cooling
water.
⇒
At installation of this laser welder, our engineer will take charge of adjustments.
Accordingly, this Operation Manual does not describe the adjusting method at
a startup. When the laser is transferred to another installation place, it may be
necessary for our engineer to perform inspection and re-adjustments.
1. Installation Place
The space required for installing the laser welder and the environment suitable
for the installation are explained below.
Install laser welder in a sure place at a level with the ground surface. If the product is
operated in inclined or fallen form, a failure will occur.
⇒
For the power supply side, we earnestly recommend using a leakage breaker
with the rated current of 10 A or more, which is applicable to harmonics and
surges.
⇒
Perform class C grounding work (Ministry of Economy, Trade and Industry
"Technical Standards for Electric Equipment").
Space Required for Installation
In the installation place of this product, at least 500 mm of space is required in front,
back, right, left and upper sides to cool the internal parts.
Install the product in a place remote from the wall as shown in the figure on the next
page.
Installation and
Preparation Part
Содержание ML-2350A-CE
Страница 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Страница 19: ...Introduction Part...
Страница 20: ......
Страница 37: ...Installation and Preparation Part...
Страница 38: ......
Страница 46: ......
Страница 57: ...Operating Part...
Страница 58: ......
Страница 118: ......
Страница 128: ......
Страница 150: ......
Страница 174: ......
Страница 179: ...Maintenance Part...
Страница 180: ......
Страница 209: ...Appendixes...
Страница 210: ......