
2. Maintenance of the Cooler Unit Section
185
ML-2350A/2351A
Chapter 1 How to Perform Maintenance
Introduction Part
Operating Part
Maintenance Part
Appendixes
Installation
and
Preparation
Part
(4) The staffing assembly and the valve body are temporarily assembled. Remove
the valve body by pulling them.
⇒
Take care not to lose the main valve screw.
(5) Take out the filter from the valve body and wash out the dust with which the mesh
is clogged.
(6) Return the filter into the initial status and assemble the solenoid valve in the
reverse order.
⇒
Confirm that the gasket is surely set in the groove of the valve body.
⇒
Temporarily tighten the 4 body mounting screws and then tighten them diagonally
and uniformly with a recommended tightening torque of 0.81 to 0.99 N•m.
<Notes>
- The valve body and the main body have the assembling direction. Assemble
them according to the direction of arrow indicated on each body.
- The valve body and the staffing assembly have the assembling direction. They
are assembled only in the specified direction.
- Confirm that there is no abnormality by making a test run after disassembling or
reassembling the solenoid valve.
(7) Install the solenoid valve cover.
(8) Return the disconnected hose and secure it with the hose band.
Body mounting screw
(4 pieces)
Valve body
Filter
The keys of the staffing assembly are
hooked to the valve body (4 positions).
Содержание ML-2350A-CE
Страница 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Страница 19: ...Introduction Part...
Страница 20: ......
Страница 37: ...Installation and Preparation Part...
Страница 38: ......
Страница 46: ......
Страница 57: ...Operating Part...
Страница 58: ......
Страница 118: ......
Страница 128: ......
Страница 150: ......
Страница 174: ......
Страница 179: ...Maintenance Part...
Страница 180: ......
Страница 209: ...Appendixes...
Страница 210: ......