
220
ML-2350A/2351A
Timing Chart
(*: Operation on the user side)
(After a laser output, the
charging status may lower.)
Charging completed
60s max.
Laser beam is output repeatedly
according to Schedule 7
The laser repetition stops when
Laser Stop signal is input
*1
Repeated operation (EXTERNAL CONTROL)
The following diagram shows the lapse of time in the case where a signal is sent from the
PLC and schedule signal input, BEAM1 and BEAM2 are selected, and then laser light is
simultaneously output from input unit 1 and input unit 2 by opening the resonator shutter.
*1 60s max.
Charging time. When a high voltage is turned ON and charging is
completed, the READY status is provided.
*2 150ms or more Shutter operation time
*3 40ms
Time required for the end signal to be output after a laser output.
*4 40ms
Time required for outputting a signal to indicate whether the laser
energy is within the set upper limit value (HIGH) and lower limit value
(LOW) of monitor output.
High Voltage ON Output
Ready Output
Schedule 1 Input *
Schedule 2 Input *
Schedule 4 Input *
Schedule 8 Input *
Schedule 16 Input *
Beam Select 1 Input *
Beam Select 2 Input *
Laser Start Input *
(Laser light)
Laser Stop Input *
End Output
Monitor Normal/
Trouble Output
150ms or more *2
40ms *3
Continuous output by 2-powersharing from input units 1 and 2
*4
1ms or more
The time set on the MEMORY SWITCH screen or more
Содержание ML-2350A-CE
Страница 1: ...AA06OM1173714 18 OPERATION MANUAL YAG LASER WELDER ML CE 2350A 2351A Original instructions...
Страница 19: ...Introduction Part...
Страница 20: ......
Страница 37: ...Installation and Preparation Part...
Страница 38: ......
Страница 46: ......
Страница 57: ...Operating Part...
Страница 58: ......
Страница 118: ......
Страница 128: ......
Страница 150: ......
Страница 174: ......
Страница 179: ...Maintenance Part...
Страница 180: ......
Страница 209: ...Appendixes...
Страница 210: ......