MD Series
5. Connection
5-1
5.
Connection
(1) Basic Connection
*1: For the timing of weld force and start, see
(5) Timing Chart
.
*2: Be sure to connect the V SENS cable. When the V SENS cable is connected to
somewhere away from electrode (secondary conductor, etc.), the response speed
of voltage detection becomes slow even under the constant-current control.
*3: For connecting the control signal, see
(2) Connection between Master and Slave
.
*4: Install this device with a clearance of at least 20 cm between the wall and the rear.
-
+
SLAVE UNIT
POWER
READY
OVER CHAR
OVER HEAT
OVER CURR
Master
Slave
Front
Rear
(Option)
PLC
WELD STAR
Start signal
*1
(Option)
Input from PLC after force end.
Weld force signal
*1
(Option)
Input force timing from PLC.
Welding head
(Option)
V SENS cable
*2
Connect near electrode.
Secondary conductor (Option)
Connect as short and thick as
possible.
Control signal
*3
CURR SIG cable
CONTROL cable
Power cable
(Option)
(440 VA/device)
Ground one side of
power output for
safety.
Содержание MD Series
Страница 111: ......