AT-IE510 Series Installation Guide
85
11. Wait for the switch to initialize its management software and
afterwards examine the Switch ID LED. The switch is ready for normal
network operations as a stand-alone unit when its ID number is “0.”
Refer to see the
VCStack Feature Overview and Configuration Guide
on AlliedTelesis.com instructions on how to configure the operating
parameters. If the number is not “0,” repeat the procedures in this chapter.
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...