105
Chapter 10
Powering On the Stack
This chapter contains the following procedures:
“Powering On the Switches Individually” on page 106
“Powering On the Switches Simultaneously” on page 108
“Verifying the Stack” on page 110
“Monitoring the Stack Initialization Processes” on page 113
Perform “Powering On the Switches Individually” on page 106 if you want
to control the assignment of the ID numbers to the switches of the stack.
The numbers are assigned in the order in which you power on the units.
Otherwise, perform “Powering On the Switches Simultaneously” on
page 108 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the
on AlliedTelesis.com.
Note
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units.
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...