AT-IE510 Series Installation Guide
57
4. While another person holds the switch in the equipment rack, secure it
using standard equipment rack screws (not provided), as shown in
Figure 19.
Figure 19. Mounting the Switch in an Equipment Rack
5. If you are installing a VCStack, repeat this procedure to install the
remaining switches in the stack.
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...