Chapter 9: Cabling the Stacking Ports
100
Figure 60. Installing a TwinAx Cable in Slot S2
8. Repeat this procedure to connect additional switches to the stack with
TwinAx cables.
9. To create the redundant path with the ring topology shown in Figure 12
on page 40 and Figure 13 on page 41, connect a cable to the empty
stacking slots on the top and bottom switches.
10. After connecting the cables to all of the switches, go to Chapter 10,
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...