Chapter 6: Installing SFP and SFP+ Transceivers
76
Figure 35. Installing a Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat Step 1 through Step 4
to install the remaining transceivers in the switch.
5. Remove the dust cover from the transceiver, as shown in Figure 36.
Figure 36. Removing the Dust Cover from a Transceiver
6. Verify the position of the handle on the transceiver. If the transceiver is
in a top slot, the handle should be in the upright position, as shown in
Figure 37 on page 77. If the transceiver is in a bottom slot, the handle
should be in the down position.
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...