Contents
8
Chapter 5: Wiring the DC Connectors
........................................................................................................................... 61
Required Materials and Tools...................................................................................................................................... 62
Connecting the Grounding Wire .................................................................................................................................. 63
Connecting the 48/60VDC or -48/-60VDC and RETURN Wires.................................................................................. 66
Monitoring the Switch Initialization Process................................................................................................................. 71
Chapter 6: Installing SFP and SFP+ Transceivers
........................................................................................................ 73
General Guidelines...................................................................................................................................................... 74
Installing SFP and SFP+ Modules............................................................................................................................... 75
Chapter 7: Configuring the Switch for Stand-alone Operations
................................................................................. 79
Determining the Status of the VCStack Feature.......................................................................................................... 80
Starting a Local Management Session ........................................................................................................................ 81
Disabling VCStack ....................................................................................................................................................... 83
Confirming the Status of the VCStack Feature............................................................................................................ 86
Chapter 8: Verifying the Status of VCStack
.................................................................................................................. 89
Verifying the Status of VCStack .................................................................................................................................. 90
Starting a Local Management Session ........................................................................................................................ 91
Activating the VCStack Feature................................................................................................................................... 93
Chapter 9: Cabling the Stacking Ports
.......................................................................................................................... 95
Cabling Switches with TwinAx Cables......................................................................................................................... 96
Cabling Switches with SFP+ Modules ....................................................................................................................... 101
Chapter 10: Powering On the Stack
............................................................................................................................. 105
Powering On the Switches Individually...................................................................................................................... 106
Powering On the Switches Simultaneously ............................................................................................................... 108
Verifying the Stack..................................................................................................................................................... 110
Chapter 11: Troubleshooting
........................................................................................................................................ 117
Appendix A: Technical Specifications
......................................................................................................................... 121
Physical Specifications .............................................................................................................................................. 121
Environmental Specifications..................................................................................................................................... 122
Power Specifications ................................................................................................................................................. 122
Certifications.............................................................................................................................................................. 123
RJ-45 Style Serial Console Port Pinouts ................................................................................................................... 124
RJ-45 Style Alarm Port Pinouts ................................................................................................................................. 125
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...