Chapter 5: Wiring the DC Connectors
64
Figure 25. Removing the Nut from the Grounding Post
Note
Remove only the top nut from the grounding post. If necessary, use
a second 7mm wrench to hold the bottom nut still while removing the
top nut.
4. Attach the grounding lug and wire to the grounding post and secure
them with the nut removed in Step 3 and a 7mm wrench. Allied Telesis
recommends tightening the nut to 15 in-lbs. Refer to Figure 26.
Figure 26. Installing the Grounding Wire
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...