
AT-IE510 Series Installation Guide
71
Monitoring the Switch Initialization Process
It takes about thirty seconds to initialize the management software. To
monitor the initialization process, do one of the following:
Watch the switch ID LED. It displays the number “8” for about the
first 15 seconds and then the number “1.”
Connect a terminal, or a computer that has a terminal emulator
program, to the Console port on the switch. The bootup sequence
is complete when the “awplus login” prompt appears.
After the switch is initialized, do one of the following:
If you are installing a VCStack, go to Chapter 8, “Verifying the
Status of VCStack” on page 89.
If you are installing a stand-alone switch, go to Chapter 7,
“Configuring the Switch for Stand-alone Operations” on page 79.
Содержание AT-IE510-28GSX-80
Страница 1: ...613 002101 Rev B IE510 Series Industrial Ethernet Switches AT IE510 28GSX 80 Installation Guide...
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 44: ...Chapter 2 Virtual Chassis Stacking 44...
Страница 60: ...Chapter 4 Mounting the Switch 60...
Страница 72: ...Chapter 5 Wiring the DC Connectors 72...
Страница 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Страница 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Страница 116: ...Chapter 10 Powering On the Stack 116...
Страница 120: ...Chapter 11 Troubleshooting 120...
Страница 126: ...Appendix A Technical Specifications 126...