Managing the Directory Structure (Non-Redundant)
Managing CMM Directory Content
page 4-14
OmniSwitch 6800/6850/9000 Switch Management Guide
December 2007
To reboot the switch from the certified directory, enter the
reload
command at the prompt:
-> reload
This command loads the image and configuration files in the certified directory into the RAM memory.
These files control the operation of the switch.
Note.
When the switch reboots using the
reload
command, it will boot from the certified directory. Any
information in the running configuration that has not been saved to the working directory will be lost.
To reboot the switch from the certified directory with a completed CMM reload, enter the following
command at the prompt:
-> reload with-fabric
Note
.
On OmniSwitch 9000 switches only, the CPM, CFM and CPU can be reset independently.If the
local/remote fabric module is in up (good) state, only the CPM will be reset. If the local/remote fabric
module is in a down (bad) state, then the complete CMM will be reloaded.
Scheduling a Reboot
It is possible to cause a reboot of the primary or secondary CMM at a future time by setting time parame-
ters in conjunction with the
reload
command, using the
in
or
at
keywords.
To schedule a reboot of the primary CMM in 3 hours and 3 minutes, you would enter:
-> reload primary in 3:03
To schedule a reboot of the primary CMM for June 30 at 8:00pm, you would enter:
-> reload primary at 20:00 june 30
Note.
Scheduled reboot times should be entered in military format (i.e., a twenty-four hour clock).
Cancelling a Scheduled Reboot
To cancel a scheduled reboot, use the
cancel
keyword. A cancel command can be specified for a primary
reboot, a secondary reboot, or all currently scheduled reboots. For example, to cancel the primary reboot
set above, enter the following:
-> reload primary cancel
To cancel all scheduled reboots with a single command, enter the following:
-> reload cancel
Содержание OmniSwitch 6850 Series
Страница 12: ...Contents xii OmniSwitch 6800 6850 9000 Switch Management Guide December 2007...
Страница 20: ...page xx OmniSwitch 6800 6850 9000 Switch Management Guide December 2007...
Страница 230: ...WebView Help Using WebView page 9 20 OmniSwitch 6800 6850 9000 Switch Management Guide December 2007...
Страница 274: ...Verifying the SNMP Configuration Using SNMP page 10 44 OmniSwitch 6800 6850 9000 Switch Management Guide December 2007...
Страница 292: ...Index Index 6 OmniSwitch 6800 6850 9000 Switch Management Guide December 2007...