![Air Lift LoadLifter 7500 XL Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/air-lift/loadlifter-7500-xl/loadlifter-7500-xl_installation-manual_2874965008.webp)
MN-1033
6
Set left side brace
inside the frame (E)
Frame Rail
fig. D.4
fig. D.5
fig. D.6
3 . If necessary, disconnect the wiring harness from the driver’s (left) side frame rail to gain
clearance for the upper brace (Fig . D .4) . Also, push out the harness connector that
holds the electrical lines going to the gas/DEF tank in or out of the tank bracket . This
will improve socket/bolt access required for installing and tightening the frame brace
(Fig . D .5) .
4 . If the truck has a fifth-wheel hitch already installed,
other than the standard factory
Reese hitch, remove the hardware that bolts the side bracket (plates) to the outside
of the frame above the axle .
INSTALLING THE BRACES
Gas engine models have emission lines on the inside of the frame . If the truck has
emission lines running along the inside of the frame rail (Fig . D .6), relocate those lines as
follows:
1 . Carefully push the line holder out of the frame above the axle and save for reuse .
Remove any emissions/fuel line retaining clips and electrical wire loom retaining clips
forward or rearward of the axle to aid in positioning the lines once the upper brace
has been installed (Figs . D .6 & D .7) .
If equipped, this
emissions/fuel line
retaining clip must
be pulled away
from the frame in
order to install the
upper frame brace
(E) .
Push this
electrical harness
connector out
of the gas/DEF
tank bracket for
better access to
mounting hole/slot
in frame .
Remove the line
holders from
the gas/DEF
tank bracket for
easier access to
the upper brace
hardware.
LoadLifter 7500
XL
6
Содержание LoadLifter 7500 XL
Страница 2: ......