![Aeronaut 3033/00 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/aeronaut/3033-00/3033-00_assembly-instructions-manual_2862741030.webp)
Install funnel in folding mechanism on top of boiler house roof.
Push funnel onto boiler house roof and make sure, part 130 is
in a horizontal position. Glue to funnel with CA.
For final installation of funnel (when all parts have been
painted) apply a drop of CA through hole in brass tube to
achieve a strong bond with axle 121.
Attach balancing weights to axle and secure
with M1.4 schrews 125.
Tip:
Glue screws 125 into axle with a drop of
general purpose adhesive. This will make it
easier to remove balancing weights if required.
Slide brass tube 120 through tabs of
funnel base ring 130 and with the
help of a small clamp align tabs on
tube in such a way that tabs are
centred and parallel to each other.
Note:
Centre hole in brass tube
should face upward!
Solder or glue tabs to brass tube. But
do not glue part 130 to funnel at this
point!
37
39
40
38
130
120
130
121
125
Bend photo etched part 130
around funnel and bend
mounting tabs as illustrated.
Содержание 3033/00
Страница 1: ...aero naut S dersand Order No 3033 00...