![Aeronaut 3033/00 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/aeronaut/3033-00/3033-00_assembly-instructions-manual_2862741020.webp)
Glue part 71 to superstructure. Front and rear edge of part 71 are
flush with former 52 and front wall of wheelhouse, respectively.
Chamfer top edge of part 72 to fit part 71, then glue in place. When
dry, sand over complete assembly.
Note:
The basic components of the superstrucutre are now complete.
Apply two coats of sanding sealer to inside and outside of assemblies,
then go ahead with the building process.
Fit in place rear cover of superstructure, then glue.
Fit boiler house roof in place and glue, if required
(see note).
Glue together wheelhouse steps 73/74 and glue in
place on either side of wheelhouse.
Apply filler to notches in wheelhouse side panels
and boiler house roof, sand and treat with suitable
primer.
Note:
As the boiler house roof fits between side
panels, it is also possible to just wedge it in place
and make it removeable.
11
12
71
72
73
74
Содержание 3033/00
Страница 1: ...aero naut S dersand Order No 3033 00...