Hardware Installation
3-11
Drilling the Second Hole
6.
As in Step 4, drive the remaining anchor stud through the bracket, into the drilled hole, until seated. Then
thread and tighten the nut.
Securing the Stainless Steel Wall Mount With the Second Nut
7.
Use a torpedo level (or similar) to verify the pipe portion of the Stainless Steel Wall Mount is horizontally
level.
Содержание ECHO 9000
Страница 13: ...Introduction and Overview 1 9 First Page of the ECHO IECEx Certificate of Conformity ...
Страница 16: ...1 12 ADS ECHO Manual Sample ECHO Declaration of Conformity Page 1 ...
Страница 17: ...Introduction and Overview 1 13 Sample ECHO Declaration of Conformity Page 2 ...
Страница 61: ...Hardware Installation 3 21 Manhole Depth and Physical Offset Measurements ...