Initial Configuration and Activation
2-9
3.
Select the devices that are desired to assign to the current location from the
Available Devices
dialog
box. To select multiple devices, press and hold down the
Control (Crtl)
key on your keyboard while
selecting the individual devices. The device must be highlighted in the selection box to ensure
QstartXML
includes the device in the XML. The user can also deselect devices to remove from
association with the selected monitor from this selection box in the same way. To choose consecutive
devices in the list, select the first device that is desired to be assigned to the monitor, press and hold
down the Shift key, and then click the last device in the series to be included.
4.
Click on the
OK
button in the
Available Devices
dialog box. The selected devices will display in the
Devices
list box on the main screen.
5.
To edit the parameters associated with a device, select the desired device to view or modify from the
Devices
list and click the
View
button. The
Location Name
and
Device Name
are displayed at the
top of the dialog. Edit or modify the device parameters as necessary, and then click on the
OK
button
when complete. Refer to the following sections for details concerning the parameters for each specific
device.
6.
Repeat step 5 for each additional device that requires modification of the parameters, and then click the
Save
button to save the devices with any parameter modifications to the local directory or network.
Editing the Long Range Depth Device
Long Range Depth
Dialog
•
Manhole Depth
– Enter the distance (in inches or millimeters) from the manhole rim to the center of the
invert. If the manhole depth is not yet known, the default manhole depth can be used for the initial
configuration.
•
Physical Offset
– Enter the distance (in inches or millimeters) from the manhole rim to the bottom of the
parabolic reflector. If the installed physical offset of the
ECHO
is not yet known, the default physical
offset can be used for the initial configuration.
Содержание ECHO 9000
Страница 13: ...Introduction and Overview 1 9 First Page of the ECHO IECEx Certificate of Conformity ...
Страница 16: ...1 12 ADS ECHO Manual Sample ECHO Declaration of Conformity Page 1 ...
Страница 17: ...Introduction and Overview 1 13 Sample ECHO Declaration of Conformity Page 2 ...
Страница 61: ...Hardware Installation 3 21 Manhole Depth and Physical Offset Measurements ...