–ii–
Section 8:
WIRELESS (RF) ZONE EXPANSION..........................................................30
Common Characteristics of Wireless Zones...................................................... 30
Wireless System Operation and Supervision.................................................... 30
Wireless System Installation Advisories........................................................... 31
Installation and Setup of 4281/5881 RF Receivers .......................................... 31
Installation/Wiring of the 5800TM Module ...................................................... 32
House ID Sniffer Mode ....................................................................................... 32
5700 Series Transmitter Setup.......................................................................... 33
Wireless Zone Assignments for 5700 Series Transmitters .............................. 33
Compatible 5700 Series Transmitters............................................................... 35
5800 Series Transmitter Setup.......................................................................... 36
Compatible 5800 Series Transmitters............................................................... 37
Checkout Procedure for Wireless Zones ............................................................ 39
Section 9:
RELAY OUTPUTS & POWERLINE CARRIER DEVICES ......................40
Output Device Basics ......................................................................................... 40
Wiring the 4204 Relay Module .......................................................................... 40
Wiring the 4300 Transformer ............................................................................ 41
Section 10:
4285 VISTA INTERACTIVE PHONE (VIP) MODULE .............................43
Mounting the 4285 VIP Module ........................................................................ 43
Wiring the 4285 VIP Module ............................................................................. 43
Section 11:
AUDIO ALARM VERIFICATION (AAV) UNIT ..........................................46
AAV Module Operation ...................................................................................... 46
AAV Module Connections................................................................................... 47
Section 12:
VIDEO ALARM VERIFICATION (VAV) UNIT ..........................................48
Section 13:
VOLTAGE TRIGGERS (Connector J7).......................................................49
Ground Start Trigger Setup............................................................................... 50
Open/Close Trigger Setup .................................................................................. 50
Remote Keypad Sounder .................................................................................... 50
Keyswitch Setup ................................................................................................. 51
Keyswitch by Partition Configuration............................................................... 52
Auxiliary Alarm Signaling Equipment (Long Range Radio) ........................... 52
Section 14:
EXTERNAL SOUNDERS................................................................................53
Section 15:
EVENT LOG OPTIONS ..................................................................................54
Event Log Printer Connections.......................................................................... 54
Event Logging Procedures ................................................................................. 55
Event Log Printer and Display Codes ............................................................... 57
Section 16:
FINAL POWER-UP PROCEDURE...............................................................58
Earth Ground Considerations............................................................................ 58
Connecting the Transformer .............................................................................. 58
Connecting The Battery ..................................................................................... 59
Polling Loop Current Drain Worksheet ............................................................ 60
Auxiliary Device Current Drain Worksheet ..................................................... 60
Section 17:
ACCESS CONTROL VIA ADEMCO PASSPOINT ACM...........................61
Содержание VISTA-120
Страница 2: ...THANK YOU For Choosing Ademco s Vista 120...
Страница 9: ...1 PART 1 HARDWARE INSTALLATION PROCEDURES...
Страница 72: ...64 PART 2 PROGRAMMING THE SYSTEM...
Страница 151: ...143 PART 3 SYSTEM OPERATION AND TESTING...