– 92 –
The system will then enter an optional confirmation mode so
that the operation of the actual programmed input can be
confirmed. Activate the loop input or button that corresponds to
this zone. We recommend that you confirm the
programming of every device before proceeding to the
next zone.
010 CONFIRM RF:1
A022-4064 1
When the system sees activity on the appropriate input, it will beep
three times and display the confirmation message.
At any time during this step, you may press the [*] key on the keypad or the upper left-hand button of
the programme tool if you are satisfied with the serial and loop number combination that has been
enrolled, regardless of whether or not the enrolled input has been "confirmed."
If the incorrect device has been enrolled, press the [#] key on the keypad or upper right-hand button
on the programme tool to delete the serial number and return to the "LEARN S/N" prompt. A single
long beep will be heard from the keypad to verify pressing of the upper right-hand button. Then,
press "1" (Yes) or press the upper left-hand button of the programme tool (a single short beep will
verify the system is ready for enrolling) and re-activate the proper device loop input.
010 ZT P RC B INL
s 03 2 3C 0 RF1
The summary screen for the zone will appear. Note that an "s"
indicates that a serial number has, in fact, been enrolled. Press [*]
to accept the zone information.
If you want to delete the serial number, press [#]. This will bring
you back to the “INPUT TYPE” prompt. Press [*] to change input
type, loop number, and serial number.
When you have finished programming all zones, test each using the system's TEST mode. Do not
use the Transmitter ID Sniffer mode for this, as it will only check for transmission of one zone on a
particular transmitter, NOT the zones assigned to each additional loop, and will not verify polling
loop type zones.
Содержание VISTA-120
Страница 2: ...THANK YOU For Choosing Ademco s Vista 120...
Страница 9: ...1 PART 1 HARDWARE INSTALLATION PROCEDURES...
Страница 72: ...64 PART 2 PROGRAMMING THE SYSTEM...
Страница 151: ...143 PART 3 SYSTEM OPERATION AND TESTING...