![ABB AO2000 Series Скачать руководство пользователя страница 284](http://html.mh-extra.com/html/abb/ao2000-series/ao2000-series_operating-instructions-manual_4321284.webp)
284
AO2000
CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B
Combustion gas supply from a central unit
1
Switch off the gas analyzer power supply. Ensure that the shut-off valve
in the combustion gas supply line is open.
2
Set the combustion gas pressure at 1.1 x the normal pressure of the
combustion gas, i.e. at approx. 1.4 bar.
3
Mark pressure indication on the gauge of the pressure reducer.
4
Shut off the combustion gas supply.
5
Observe the display on the pressure gauge – it should not change
measurably in 10 minutes.
A measurable change in the display is an indication of a leak in the
combustion gas path between the pressure reducer and the combustion
gas inlet valve of the gas analyzer. In this case the following measures
are to be taken:
1
Check the combustion gas line between the pressure reducer and
gas analyzer with a leak detection spray. A leak in this area must be
remedied and another leak test must be performed before the gas
analyzer is put into operation again.
2
If no leak is found that means the gas analyzer combustion gas inlet
valve is leaky.
In this case, the gas analyzer may not be returned to
service on any account!
The combustion gas inlet valve must be re-
placed by ABB Service.
6
After conclusion of the seal integrity test, set the combustion gas pres-
sure to normal pressure again, i.e. 1.2 bar.
Содержание AO2000 Series
Страница 2: ......
Страница 153: ...AO2000 CONTINUOUS GAS ANALYZERS OI AO2000 EN REV B 153 Menu tree Menu tree ...
Страница 182: ...182 AO2000 CONTINUOUS GAS ANALYZERS OI AO2000 EN REV B The Function blocks sub menu ...
Страница 361: ......