ACH580 Installation, Operation and Maintenance Manual
15
ACH580-01 Installation
IP21 (UL (NEMA) Type 1)
6. Remove the front cover: Remove the fastening screws (a), with a T20 Torx
screwdriver, move the cover to the top side (b) and then up (c).
7. Attach the cable box to the drive frame.
8. Tighten the box bolts: three at the top (8a) and two at the bottom (8b). Also tighten
the bottom bolts started in step 3 (8c).
IP55 (UL (NEMA) Type 12)
9. Remove the front cover: Remove the fastening screws (a), with a T20 Torx
screwdriver, move the cover to the top side (b) and then up (c).
Note:
Install the hood on UL (NEMA) Type 12 drives after you have installed the
drive electrically and reinstalled covers.
Installing the drive vertically side by side
Install the drive following the steps in the appropriate section
(page
Installing the drive vertically, frame R5
) or
Installing the drive vertically, frames R6…R9
).
6a
7
M8×6
6a
6b
6c
8a
8c
8b
6a
6a
6b
6c