Connection, installation / mounting
System Manual
│45
1
2
Fig. 24: Mounting installation boxes in solid walls: Wall work
3. After the plastering / painting work is concluded, remove the protective cover.
– After the plastering / painting work is concluded, the wall may only project a maximum of
7 mm over the plastered box. If it is more, the indoor station can no longer be inserted.
2
1
2
Fig. 25: Mounting installation boxes in solid walls: Inserting flush-mounted installation box
4. Insert the flush-mounted installation box.
– Attention:
Ensure that the encircling "Collar" of the flush-mounted installation box rests on the
facade. The encircling "Collar" of the flush-mounted installation box must not be
submerged in the facade. The device can then not be mounted later.
– No additional accessories are necessary for mounting.
Содержание 2TMA130050B0055
Страница 1: ...System Manual 23 02 2021 ABB Welcome IP Branding Release 2018 01 01 ...
Страница 182: ...Case studies System Manual 182 P E o P Up Link P E o Fig 172 Overview Perimeters ...
Страница 188: ...Notes System Manual 188 9 Notes ...
Страница 190: ...Index System Manual 190 T Table installation 51 54 W Wall mounting 52 Wiring of a ABB Welcome IP system 11 ...