Commissioning
System Manual
│70
6.2.4
Outdoor station with display
Fig. 49: Outdoor station with display: Settings
The wizard is displayed after the device has booted up automatically and will guide you through
the first setup. If the device has already been setup, the main menu is displayed directly.
To address the device, perform the following steps:
1. Boot up the device.
– The device boots up automatically when the power supply is connected.
2. For initial commissioning: Follow the steps of the wizard for the initial commissioning.
– First select the language.
3. Open the "Entry code" function in the standby mode.
4. In window "Password" enter the following: [#*] + settings pa [#]
– The device automatically switches to the selection windows of the setting areas.
– On the password, see the information at the end of this section.
Содержание 2TMA130050B0055
Страница 1: ...System Manual 23 02 2021 ABB Welcome IP Branding Release 2018 01 01 ...
Страница 182: ...Case studies System Manual 182 P E o P Up Link P E o Fig 172 Overview Perimeters ...
Страница 188: ...Notes System Manual 188 9 Notes ...
Страница 190: ...Index System Manual 190 T Table installation 51 54 W Wall mounting 52 Wiring of a ABB Welcome IP system 11 ...