Case studies
System Manual
│184
UP-link connection for the cascading (series switching) of switches:
– When the switch has an up-link connection:
Connect the up-link connection with a normal LAN cable with a LAN connection of the next
switch.
– When the switch has no up-link connection:
Connect a LAN connection with a crossover cable with a LAN connection of the next switch.
Attention!
Malfunctions
– For building-interlinking cabling, observe the specifications of the structured
cabling (glass fibre line), see chapter 1.2 “Fundamentals of structured
cabling“ on page 7.
Содержание 2TMA130050B0055
Страница 1: ...System Manual 23 02 2021 ABB Welcome IP Branding Release 2018 01 01 ...
Страница 182: ...Case studies System Manual 182 P E o P Up Link P E o Fig 172 Overview Perimeters ...
Страница 188: ...Notes System Manual 188 9 Notes ...
Страница 190: ...Index System Manual 190 T Table installation 51 54 W Wall mounting 52 Wiring of a ABB Welcome IP system 11 ...