Commissioning
System Manual
│67
6.2.2
Physical addresses ― Preparing addressing
If the devices have a display, the addressing is carried out on the device itself.
If the devices do not have a display, the addressing is carried out via the IP Touch 7.
Devices with display
– As soon as the devices are supplied with voltage via the PoE switch, the device boots up
automatically.
The devices are prepared for addressing.
Devices without display
– Connect the devices to the indoor station via a PoE switch.
– As soon as the devices are supplied with voltage via the PoE switch, the device boots
up automatically.
The devices are prepared for addressing.
Содержание 2TMA130050B0055
Страница 1: ...System Manual 23 02 2021 ABB Welcome IP Branding Release 2018 01 01 ...
Страница 182: ...Case studies System Manual 182 P E o P Up Link P E o Fig 172 Overview Perimeters ...
Страница 188: ...Notes System Manual 188 9 Notes ...
Страница 190: ...Index System Manual 190 T Table installation 51 54 W Wall mounting 52 Wiring of a ABB Welcome IP system 11 ...