RT40 Operator’s Manual
Service - 139
As Needed
To install chain:
1.
Lay chain on ground with teeth down and pointed toward unit. Loop cable through end links.
2.
Fasten and adjust seatbelt.
3.
Start tractor. See page 58 for start-up procedures.
4.
Disenage parking brake.
5.
Move ground drive control to reverse.
6.
Back unit up until chain extends past head shaft about 1’ (305 mm).
7.
Move ground drive control to neutral.
8.
Lower backfill blade to ground.
9.
Lower boom to horizontal position.
10. Engage parking brake.
11. Turn ignition switch to STOP.
12. Pull rear end of chain over tail roller or sprocket.
13. Pull until chain is in place on boom.
14. Move chain down boom until chain connector pin and lock key can be installed. Install connector pin
and lock key.
15. Tighten chain by pumping EPG into grease cylinder.
Time Augers
Ensure that augers are balanced, as shown. If auger
timing is off, unit will bounce from side to side even in
normal digging conditions.
To adjust timing:
1.
Remove bolts holding augers to auger shaft and
rotate either auger as needed until augers are
balanced.
2.
Reinstall bolts and tighten securely.
t12om081h.eps
*Always follow manufacturer instructions*
*AAA Rent-All 225-291-1356*
Содержание RT40
Страница 71: ...Transport 70 RT40 Operator s Manual Tow CMW Always follow manufacturer instructions AAA Rent All 225 291 1356 ...
Страница 95: ...Backhoe 94 RT40 Operator s Manual CMW Always follow manufacturer instructions AAA Rent All 225 291 1356 ...
Страница 143: ...Service 142 RT40 Operator s Manual As Needed Always follow manufacturer instructions AAA Rent All 225 291 1356 ...
Страница 162: ... Always follow manufacturer instructions AAA Rent All 225 291 1356 ...
Страница 163: ... Always follow manufacturer instructions AAA Rent All 225 291 1356 ...