26
3D Systems, Inc.
INSTALL PRINT PLATFORM
1. Clean the platform (both front and back), using 91% isopropyl alcohol
before installing the platform into the 3D printer system.
2. Open the chamber door.
3. The adjacent view shows the
bottom
of the print platform. The recessed
area on the bottom of the platform is placed toward the front of the 3D
printer system.
4. Place the platform on the Z-carriage so the rear edge of the platform is
positioned in front of the rear brackets.
5. Slide the platform toward the rear of the 3D printer system until it is
fi rmly pressed against the rear brackets. Press down on the platform
at the points indicated to make certain the platform is “seated” onto the
Z-carriage.
6. Close the front door and press the
Start
key on the touchscreen to bring
the 3D printer system online.
INSTALL WASTE BAGS IN THE WASTE DRAWERS
1. Open the upper left and upper right MDM.
2. Slide both waste drawers completely out of the 3D printer system.
3. Install a plastic waste bag into each drawer.
4. Close waste drawers and MDMs.
5. Press the
Start
key to resume.