Hydraulic Digger
4-38
4. Unload the machine from the transport vehicle
1) Need to choice the hard
、
smooth road when it
load/unload. It needs to keep a safe distance with the
edge of the road
2) Braking the transport vehicle, and put he stow-wood
under the wheels to make sure the transport vehicle
doesn’t move
3) Install the ramp between the transport vehicle and the
machine, and make sure the ramps in one plane. The
max. gradient not exceed 15
0
.And adjust the distance of
the ramps match with the center of the pedrail
4) Take-down the steel wire which fix the machine
5) Start the machine. It need to warm-up the machine in the
winter
6) Put down the safety lock handle
7) Upgrade the lever and the bucket, uplift the bulldozer
8) Check the area not have the roadblock
9) Pull up the lock pin of the platform make the platform
rotate 180
0
, the dig device to the slope, and the digger to
the direction which go ahead.
10) The digger go ahead slowly to the top of the ramp, let the
Summary of Contents for YC25-8
Page 1: ...Hydraulic Digger USER MANUAL ...
Page 6: ...Guangxi Yuchai Heavy Industry Company Limited ...
Page 7: ...Hydraulic Digger 1 1 1 Prolegomena ...
Page 14: ...Hydraulic Digger 1 8 3 Bucket series black area is standard collocate ...
Page 16: ...Hydraulic Digger 2 1 2 Safety Rules ...
Page 19: ...Hydraulic Digger 2 4 ...
Page 25: ...Hydraulic Digger 2 10 10 Long arm warming mark 11 Left locked mark 12 Warning marks ...
Page 57: ...Hydraulic Digger 3 1 3 Parts Introduction ...
Page 79: ...Hydraulic Digger 4 1 4 Operation Manual ...
Page 92: ...Hydraulic Digger 4 14 Caution Avoid the machine stop suddenly it need have enough space ...
Page 94: ...Hydraulic Digger 4 16 ...
Page 100: ...Hydraulic Digger 4 22 ...
Page 131: ...Hydraulic Digger 5 1 5 Maintenance ...