Hydraulic Digger
5-49
append the oil)
8) Clean the bolt
②
,install to the reducer again. The tighten
moment is 12-15Nm.
2. Replace the lube (For each reducer)
Replace it every 1000 hours
1) Stop the digger on the level road.
2) Turn the driving reducer make the bolt
①
in ”b” position(see the
picture)
3) Vent the oil when the oil of the reducer in the hot state.
Caution: Don’t let the hot oil scald
4) Loose the bolt
①
and vent the oil, and loose the bolt
②
make
vent the oil complete
5) Turn the driving reducer make the bolt in ”a” position
6) Append the oration lube thought the sprue till the check hole
②
of the level has the oil out.
7) Screw down
①
and
②
,the tighten moment is 12-15Nm.
Summary of Contents for YC25-8
Page 1: ...Hydraulic Digger USER MANUAL ...
Page 6: ...Guangxi Yuchai Heavy Industry Company Limited ...
Page 7: ...Hydraulic Digger 1 1 1 Prolegomena ...
Page 14: ...Hydraulic Digger 1 8 3 Bucket series black area is standard collocate ...
Page 16: ...Hydraulic Digger 2 1 2 Safety Rules ...
Page 19: ...Hydraulic Digger 2 4 ...
Page 25: ...Hydraulic Digger 2 10 10 Long arm warming mark 11 Left locked mark 12 Warning marks ...
Page 57: ...Hydraulic Digger 3 1 3 Parts Introduction ...
Page 79: ...Hydraulic Digger 4 1 4 Operation Manual ...
Page 92: ...Hydraulic Digger 4 14 Caution Avoid the machine stop suddenly it need have enough space ...
Page 94: ...Hydraulic Digger 4 16 ...
Page 100: ...Hydraulic Digger 4 22 ...
Page 131: ...Hydraulic Digger 5 1 5 Maintenance ...