![background image](http://html1.mh-extra.com/html/yuchai/yc20sr/yc20sr_operation-manual_3666187078.webp)
69
7
)
Lock the platform.
8
)
Use the pilot valve safety handle to pull up the left control box and put the machine
in the locked position.
4.14.
After operation
4.14.1.
Check
Check the engine water temperature, oil pressure, fuel pressure, fuel level, etc. on
the digital monitor of the machine.
4.14.2.
Lock up
Lock the following areas.
A Fuel tank filling port
B Engine hood
ATTENTION: When opening the hood, no one should stand at the back of the
hood,the engine hood might pop up and hurt people.
4.15.
Loading and unloading and transportation
4.15.1.
Safety rules
1)
Run the engine at low speed and operate the machine slowly when
loading/unloading.
2)
Do not load/unload the machine when it is in automatic warm-up state.
3)
If the automatic warm-up is canceled during the loading/unloading operation, the
speed will change suddenly.
4)
Loading/unload the machine on solid, level ground. Keep a safe distance from the
edge of the road.
5)
Use a ramp of sufficient width, length, thickness and strength. The width of the
hitch should be of 1.2-1.5 times the width of the track. To avoid any accidents, it