![background image](http://html1.mh-extra.com/html/yuchai/yc20sr/yc20sr_operation-manual_3666187031.webp)
22
After the engine is started, check the following
1)
Safety belt fastened properly.
2)
The working device, bulldozing device, traveling, slewing, working device
deflection and other moving parts work normal.
3)
There is any abnormality in the sound, vibration, smell or gauge of the machine.
4)
Oil or fuel leakage
2.6.2.
Travel and Swinging
1)
Before traveling, turn the upper
platform to the proper position with the
working device in the same direction as
the dozer. If the working device is in the
opposite direction of the dozer, the
operation will be reversed.
2)
Sound the horn before traveling
and slewing to warn people in the
working area.
3)
The excavator must travel and operate on solid ground of more than 1.5 times its
width.
4)
Before backing up and slewing, if there is visually blocked area, make sure a
signal commander is at the site.
5)
Before traveling, the cab door should be closed and locked, and the cab window,
rollover window and sunroof are allowed to be opened, but must be secured.