Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
DOCR-071030-A (10/7/2022)
Page 122 of 131
Measurement Tolerances
The data supplied by the inverter may differ from measurements taken by certified measuring instruments (e.g.
output meters, multimeters and grid analyzers). The inverter is not a measuring instrument and has wider
tolerances for the measurements it makes.
Inverter tolerances are generally:
•
±5% for real-time measurements with output power below 20% nominal power
•
±3% for real-time measurements with output power above 20% nominal power
•
±4% for all statistical data
Yaskawa Solectria Solar PVI 25TL-208, PVI 50TL-480, AND PVI 60TL-480inverter tolerances are specified below:
•
Voltage tolerances:
±1%
•
Current tolerances:
±2%
•
Frequency tolerances:
±0.5%
•
Power tolerances:
±3%
•
Time tolerances:
±1%
•
Temperature tolerances:
±2°C