![YASKAWA JEPMC-MP2300S-E User Manual Download Page 135](http://html.mh-extra.com/html/yaskawa/jepmc-mp2300s-e/jepmc-mp2300s-e_user-manual_907071135.webp)
5.1 Startup Sequence and Basic Operation
5.1.2 Startup Sequence
5-3
5
Outline of Motion Control Systems
5.1.2 Startup Sequence
The startup sequence for the MP2300S from the moment when the power has been turned ON is shown in the follow-
ing flowchart.
* Refer to
5.1.3 Startup Sequence Operation Details
on the next page for details on (1) to (5).
FLASH
ON
OFF
DWG.L
executed
Output
Output
DWG.H
executed
Completed
after one cycle.
DWG.I
executed
Input
Input
Low-speed
scan
High-speed
scan
Interrupt
signal
Ladder program
Power ON
Startup self-
diagnostics (1)
Memory clear
FLASH
→
RAM
Copy
Watchdog timer
start
DWG.A executed
(Ladder program)
Order of priority
High
Low
Online self-diagnostics
(5)
Background
Normal operation
Self-configuration
execution (2)
Configuration mode
S2 indicator (RUN) lit
User program stops
Operation starts (3)
Operation stops (4)
S2 indicator (RDY) lit
J
udges the setting
of switch 3 (CNFG)
of DIP switch SW1
J
udges the
setting of switch 6 (STOP)
of DIP switch SW1
J
udges the
setting of switch 4 (INIT)
of DIP switch SW1
Summary of Contents for JEPMC-MP2300S-E
Page 14: ...MEMO ...
Page 24: ...MEMO ...
Page 114: ...MEMO ...
Page 132: ...MEMO ...
Page 154: ...5 2 User Programs 5 2 2 Motion Programs 5 22 2 Example using a ladder program ...
Page 156: ...5 2 User Programs 5 2 2 Motion Programs 5 24 2 Example using a ladder program ...
Page 190: ...MEMO ...
Page 280: ...MEMO ...
Page 300: ...7 3 Operation 7 3 5 How to Determine Input Error 7 20 Continued from the previous page ...
Page 310: ...MEMO ...