![background image](http://html1.mh-extra.com/html/yamato/gas410/gas410_instruction-manual_3142218016.webp)
14
4. Operating procedures
Preparations
(
GAS410
)
(1) Open the right side door of GB210A, install a blind plate to the upper position of the
connecting port and remove a set of filter installation parts from the lower position of the
connecting port.
(2) Connect the supplied connecting tube using M4×10 truss screws.
Connecting
tube
O ring
Blind
Clamp
Filter cover
Knurled screw
Filter
Filter case
Clamp
O ring
Suction port exploded drawing