11
4. Operating procedures
Preparations
(1) Connecting the power cord
First check that the switches of the control assembly and the ELB are OFF and then connect
the power cord securely to the power supply meeting the specified voltage and current.
(2) Connecting an earth
The power cord of this unit is an earthed 3-core captire cable (VCT) that integrates an earth
wire and you must earth the green wire.
電圧側
黒
電圧側
白
接地極
屋内配線
機器
緑
(3) Connecting the exhaust duct
AIR IN operation during operation finishing process will discharge organic solvents, hot air,
and fine particles at the exhaust port out of the pipe path. Connect the supplied discharge
duct to the discharge port and discharge to external using, for example, a draft chamber.
Avoid looking into the discharge port or discharge directly to external, which might pause a
danger. The discharge port is located at the lowest part at the left side of the main unit.
(4) Connecting the collecting flask
Push the collecting flask against the connecting port below the ball valve and then fix it.
Ball valve
Collecting flask
Clamp
Rubber base type
Adjustment Pad
In-house
Voltage side
Voltage side
Ground side
Black
White
Gree
Unit