KICK STARTER KIT (OPTIONAL PARTS)
10-15
EASB29B405
MAINTENANCE
Removing the kick starter kit
1. Remove:
• Kick shaft assembly “1”
TIP
Unhook the torsion spring “2” from the hole “a”
in the crankcase.
Checking the kick starter kit
1. Check:
• Ratchet wheel “1” smooth movement
Unsmooth movement
Replace.
• Kick shaft “2”
Wear/damage
Replace the kick shaft as-
sembly.
• Spring “3”
Broken
Replace.
2. Check:
• Kick gear “1”
Wear/damage
Replace the kick shaft as-
sembly.
• Kick idle gear “2”
• Ratchet wheel “3”
• Gear teeth “a”
• Ratchet teeth “b”
Wear/damage
Replace.
3. Check:
• Kickstarter lever “1” smooth movement
Unsmooth movement
Apply the lithium-
soap-based grease to the pivoting point and
metal-to-metal moving parts.
TIP
Check the kickstarter lever movement and lu-
brication for every race.
Installing the kick starter kit
1. Install:
• Kick gear “1”
• Washer “2”
• Circlip “3”
• Ratchet wheel “4”
• Spring “5”
• Washer “6”
• Circlip “7”
(to the kick shaft “8”)
TIP
• Apply molybdenum disulfide oil to the inner
circumferences of the kick gear and ratchet
wheel.
• Align the punch mark “a” on the ratchet wheel
with the punch mark “b” on the kick shaft.
3
1
2
a
b
3
1
2
LS
1
New
New
Summary of Contents for YZ 2018 Series
Page 6: ...EASB916006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...CABLE ROUTING DIAGRAM 2 29 EASB29B065 CABLE ROUTING DIAGRAM...
Page 72: ...CABLE ROUTING DIAGRAM 2 31...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 255: ...OIL PUMP AND BALANCER GEAR 5 58 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 276: ...TRANSMISSION 5 79...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 321: ...COOLING SYSTEM For JPN 8 22...
Page 351: ...FUEL PUMP SYSTEM 8 52 EASB29B345...
Page 352: ...ELECTRICAL COMPONENTS 8 53 ELECTRICAL COMPONENTS EASB29B346 9 10 11 1 3 2 4 5 6 7 8...
Page 354: ...ELECTRICAL COMPONENTS 8 55 11 10 9 2 3 1 6 7 8 4 5...
Page 356: ...ELECTRICAL COMPONENTS 8 57 EASB29B347 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 372: ...ELECTRICAL COMPONENTS 8 73 c Measure the fuel injector resistance...