ENGINE REMOVAL
5-8
• Front engine bracket “4”
• Engine bracket bolt (front side) “5”
• Engine mounting bolt (front side) “6”
• Upper engine bracket “7”
• Engine bracket bolt (upper side) “8”
• Engine mounting bolt (upper side) “9”
TIP
Apply molybdenum disulfide grease to the pivot
shaft.
EASB29B207
INSTALLING THE BRAKE PEDAL
1. Install:
• Spring “1”
• Brake pedal “2”
• O-rings “3”
• Bolt (brake pedal) “4”
• Clip “5”
TIP
Apply the lithium-soap-based grease on the
bolt, O-rings and brake pedal bracket.
EASB29B208
INSTALLING THE DRIVE SPROCKET
1. Install:
• Drive sprocket “1”
• Drive chain “2”
TIP
Install the drive sprocket together with the drive
chain.
2. Install:
• Lock washer “1”
• Nut (drive sprocket) “2”
Engine bracket bolt (front side)
34 N·m (3.4 kgf·m, 25 lb·ft)
Engine mounting bolt (front side)
55 N·m (5.5 kgf·m, 41 lb·ft)
Engine bracket bolt (upper side)
34 N·m (3.4 kgf·m, 25 lb·ft)
Engine mounting bolt (upper
side)
45 N·m (4.5 kgf·m, 33 lb·ft)
T
R
.
.
T
R
.
.
T
R
.
.
T
R
.
.
M
7
8
9
9
8
7
4
1
2
4
3
5
5
6
Bolt (brake pedal)
26 N·m (2.6 kgf·m, 19 lb·ft)
Nut (drive sprocket)
75 N·m (7.5 kgf·m, 55 lb·ft)
New
T
R
.
.
1
2
3
4
5
LS
New
T
R
.
.
Summary of Contents for YZ 2018 Series
Page 6: ...EASB916006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...CABLE ROUTING DIAGRAM 2 29 EASB29B065 CABLE ROUTING DIAGRAM...
Page 72: ...CABLE ROUTING DIAGRAM 2 31...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 255: ...OIL PUMP AND BALANCER GEAR 5 58 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 276: ...TRANSMISSION 5 79...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 321: ...COOLING SYSTEM For JPN 8 22...
Page 351: ...FUEL PUMP SYSTEM 8 52 EASB29B345...
Page 352: ...ELECTRICAL COMPONENTS 8 53 ELECTRICAL COMPONENTS EASB29B346 9 10 11 1 3 2 4 5 6 7 8...
Page 354: ...ELECTRICAL COMPONENTS 8 55 11 10 9 2 3 1 6 7 8 4 5...
Page 356: ...ELECTRICAL COMPONENTS 8 57 EASB29B347 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 372: ...ELECTRICAL COMPONENTS 8 73 c Measure the fuel injector resistance...