5-57
CHAS
SWINGARM
10. Tighten:
9
Nut (connecting rod)
1
11. Tighten:
9
Nut (relay arm)
1
80 Nm (8.0 m•kg, 58 ft•lb)
80 Nm (8.0 m•kg, 58 ft•lb)
8. Install:
9
Bolt (connecting rod)
1
9
Plain washer
2
9
Nut (connecting rod)
3
NOTE:
9
Apply the molybdenum disulfide grease on the
bolt.
9
Do not tighten the nut yet.
9. Install:
9
Bolt (rear shock absorber-relay arm)
1
9
Nut (rear shock absorber-relay arm)
2
NOTE:
Apply the molybdenum disulfide grease on the
bolt.
53 Nm (5.3 m•kg, 38 ft•lb)
7. Check:
9
Swingarm side play
a
Free play exists
→
Replace thrust bearing.
9
Swingarm up and down movement
b
Unsmooth movement/Binding/Rough
spots
→
Grease or replace bearings, bushes
and collars.
Summary of Contents for YZ 2002 Series
Page 128: ...3 3 INSP ADJ MEMO ...
Page 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2 ...
Page 566: ...TUN MEMO ...
Page 567: ......