CHAPTER 5 Installation
5-4
2-2
Six Month Inspection
Inspect the following for the six month inspection, and replace parts if necessary.
Inspection or replacement place
Main bolts and screws on the P & P
robot
X, Y and Z axis timing belt
Machine reference after absolute reset
Wiring in P & P robot
Inside controller
Fan for air-cooling on rear of controller
Inspection or replacement details
Check for looseness. If loose, tighten.
Check the X, Y, and Z axis timing belts for tension,
scratches and wear.
Perform absolute reset and check that the machine
reference is within the specified range (45 to 55%).
• Check for scratches on the cables, etc.
• Check for looseness in the relay connectors, etc.
• Check that the relay contact point operates properly
• Check for looseness in the terminals
• Check for looseness in the connectors
• Check that the fan rotates
• Check for abnormal sounds during rotation
• Check for dirt on the fan cover. Remove and clean if
dirty.
Summary of Contents for YP-X Series
Page 1: ...OWNER S MANUAL ...
Page 2: ......
Page 6: ...MEMO ...
Page 10: ...MEMO ...
Page 12: ...MEMO ...
Page 29: ...CHAPTER 2 Functions 1 P P robot unit 2 1 2 P P robot controller 2 2 ...
Page 30: ...MEMO ...
Page 34: ...MEMO ...
Page 42: ...CHAPTER 3 Installation 3 8 Robot Cable DRCX YP320X Fig 3 5 Robot cable connections ...
Page 46: ...MEMO ...
Page 56: ...4 10 MEMO ...
Page 58: ...MEMO ...
Page 82: ...MEMO ...
Page 109: ...MEMO ...