CHAPTER 5 Installation
5-10
4-2
Replacement of Y axis belt (YP330X, YP340X)
1) Turn off the controller power.
2) Remove the robot Y axis cover.
3) Place marks(with a marker etc.) on the pulleys before replacement to limit
deviations in point data occurring due to the belt replacement. (Fig. 5-4)
4) Loosen the tension on the belt and remove the belt.
5) Place the new belt on the pulley lining it up with the marks (for synchroniz-
ing the positions of the two pulleys) you made in step 3) above.
6) Adjust the belt tension and set the origin position again by absolute reset.
(See Chapter 4.)
7) Make corrections if any point data has deviated.
Pulley
belt
Pulley
Fig. 5-6 Belt replacement
Summary of Contents for YP-X Series
Page 1: ...OWNER S MANUAL ...
Page 2: ......
Page 6: ...MEMO ...
Page 10: ...MEMO ...
Page 12: ...MEMO ...
Page 29: ...CHAPTER 2 Functions 1 P P robot unit 2 1 2 P P robot controller 2 2 ...
Page 30: ...MEMO ...
Page 34: ...MEMO ...
Page 42: ...CHAPTER 3 Installation 3 8 Robot Cable DRCX YP320X Fig 3 5 Robot cable connections ...
Page 46: ...MEMO ...
Page 56: ...4 10 MEMO ...
Page 58: ...MEMO ...
Page 82: ...MEMO ...
Page 109: ...MEMO ...