CHAPTER 5 Installation
5-13
4-5
Replacement of Z axis tip section belt (YP320X, YP330X, YP340X,
YP320XR)
1) Turn off the controller power.
2) Remove the robot Z axis cover.
3) Place marks(with a marker etc.) on the pulleys before replacement to limit
deviations in point data occurring due to the belt replacement. (Fig. 5-4)
4) Remove the bolts securing the belt tensioner in Fig. 5-9 and remove the belt
from the pulley.
5) Remove the plate gripping the belt in Fig. 5-9.
6) Prepare a new belt and grip the new belt with the plate removed in step 4).
Apply a coating of Screw-lock (or equivalent) to the M5 bolts and tighten
them.
7) Place the new belt on the pulley lining it up with the marks (for synchroniz-
ing the positions of the two pulleys) you made in step 3) above. Next install
the belt tensioner.
8) Adjust the belt tension and set the origin position again by absolute reset as
explained in the previous section. (See Chapter 4)
9) Make corrections if any point data has deviated.
Metal plate
M5 bolt
belt
Fig. 5-9 Belt replacement
Summary of Contents for YP-X Series
Page 1: ...OWNER S MANUAL ...
Page 2: ......
Page 6: ...MEMO ...
Page 10: ...MEMO ...
Page 12: ...MEMO ...
Page 29: ...CHAPTER 2 Functions 1 P P robot unit 2 1 2 P P robot controller 2 2 ...
Page 30: ...MEMO ...
Page 34: ...MEMO ...
Page 42: ...CHAPTER 3 Installation 3 8 Robot Cable DRCX YP320X Fig 3 5 Robot cable connections ...
Page 46: ...MEMO ...
Page 56: ...4 10 MEMO ...
Page 58: ...MEMO ...
Page 82: ...MEMO ...
Page 109: ...MEMO ...