CHAPTER 4 Installation
4-8
3-3
Adjustment of Z axis tip belt tension (YP220BX, YP220BXR)
1) Turn off the controller power.
2) Remove the robot Z axis cover.
3) Loosen the bolt securing the belt tensioner as shown in Fig. 4-4 and loosen
the belt.
4) Screw the M6 bolt into the hole located beneath the belt tensioner (L-shaped
metal plate) to apply tension to the belt.
5) Apply a load of 0.5 kgf to the center section of the belt for fixing the belt
tension. A slack of approximately 2mm is satisfactory.
6) If the belt tension in now satisfactory, tighten the bolts securing the belt
tensioner.
7) Install the Z axis cover for the robot.
Approx. 2mm
Load 0.5kg
M6 bolt
Securing bolt
Belt tensioner
Fig. 4-4 Belt tension
Summary of Contents for YP-X Series
Page 1: ...OWNER S MANUAL ...
Page 2: ......
Page 6: ...MEMO ...
Page 10: ...MEMO ...
Page 12: ...MEMO ...
Page 29: ...CHAPTER 2 Functions 1 P P robot unit 2 1 2 P P robot controller 2 2 ...
Page 30: ...MEMO ...
Page 34: ...MEMO ...
Page 42: ...CHAPTER 3 Installation 3 8 Robot Cable DRCX YP320X Fig 3 5 Robot cable connections ...
Page 46: ...MEMO ...
Page 56: ...4 10 MEMO ...
Page 58: ...MEMO ...
Page 82: ...MEMO ...
Page 109: ...MEMO ...