5-11
ENGINE REMOVAL
EAS30251
INSTALLING THE ENGINE
1. Install:
• All removed parts
TIP
• Apply locking agent (LOCTITE®) to engine
mounting bolt (front upper side) “1”, engine
mounting bolt (front right lower side) “2”, en-
gine mounting bolts (front left lower side) “3”,
and rear frame bolts “5”.
• For installation, reverse the removal proce-
dure.
• Do not fully tighten the bolts and nuts.
2. Tighten:
• Engine mounting bolts (front upper side) “1”
• Engine mounting bolt (front right lower side)
“2”
• Engine mounting bolts (front left lower side)
“3”
• Engine mounting nut (rear side) “4”
• Rear frame bolts “5”
TIP
When tightening the engine mounting nuts and
engine mounting bolts, do not apply an upward
load to the frame, such as supporting the area
around steering head of the frame upwards. Al-
so, do not apply an upward or downward load on
the rear frame, such as supporting the rear end
of the rear frame upwards or pushing it down-
wards.
Engine mounting bolt
(front upper side)
77 N·m (7.7 kgf·m, 57 lb·ft)
LOCTITE®
Engine mounting bolt (front right
lower side)
70 N·m (7.0 kgf·m, 52 lb·ft)
LOCTITE®
Engine mounting bolt (front left
lower side)
78 N·m (7.8 kgf·m, 58 lb·ft)
LOCTITE®
Engine mounting nut (rear side)
105 N·m (10.5 kgf·m, 77 lb·ft)
Rear frame bolt
83 N·m (8.3 kgf·m, 61 lb·ft)
LOCTITE®
T
R
.
.
1
1
2
3
4
5
5
Summary of Contents for XP560D
Page 1: ...2020 SERVICE MANUAL TMAX TMAX TECH MAX XP560EL XP560D B3T 28197 20 ...
Page 2: ......
Page 6: ......
Page 8: ......
Page 42: ...2 13 CABLE ROUTING EAS20021 CABLE ROUTING Headlight bracket front view ...
Page 44: ...2 15 CABLE ROUTING Front cowling assembly rear view ...
Page 46: ...2 17 CABLE ROUTING Frame right side view front ...
Page 48: ...2 19 CABLE ROUTING Frame right side view rear ...
Page 50: ...2 21 CABLE ROUTING Frame left side view front Q ...
Page 52: ...2 23 CABLE ROUTING Rear frame left side view center ...
Page 54: ...2 25 CABLE ROUTING Frame left side view rear ...
Page 56: ...2 27 CABLE ROUTING Frame top view front ...
Page 58: ...2 29 CABLE ROUTING Frame top view rear ...
Page 60: ...2 31 CABLE ROUTING Handlebar top and left side view for XP560E ...
Page 62: ...2 33 CABLE ROUTING Handlebar front view for XP560E ...
Page 64: ...2 35 CABLE ROUTING Handlebar top and left side view for XP560D ...
Page 66: ...2 37 CABLE ROUTING Handlebar front view for XP560D ...
Page 68: ...2 39 CABLE ROUTING Front brake front left side and right side view Q ...
Page 70: ...2 41 CABLE ROUTING Frame right side view front ...
Page 72: ...2 43 CABLE ROUTING Rear brake right side view rear ...
Page 74: ...2 45 CABLE ROUTING Fuel tank right side view ...
Page 76: ...2 47 CABLE ROUTING Fuel tank left side view ...
Page 78: ...2 49 CABLE ROUTING Fuel tank top view ...
Page 80: ...2 51 CABLE ROUTING Air filter case and throttle body left side view ...
Page 82: ...2 53 CABLE ROUTING Radiator right side view ...
Page 84: ...2 55 CABLE ROUTING Radiator left side view ...
Page 86: ...2 57 CABLE ROUTING Radiator top view ...
Page 88: ...2 59 CABLE ROUTING Hydraulic unit assembly top and front view ...
Page 90: ...2 61 CABLE ROUTING ...
Page 297: ...5 62 CLUTCH 1 3 2 ...
Page 317: ...5 82 CRANKSHAFT 2 1 2 1 2 4 3 ...
Page 320: ...5 85 TRANSMISSION ...
Page 336: ...6 15 WATER PUMP ...
Page 352: ...7 15 THROTTLE BODY ...
Page 355: ......
Page 371: ...8 16 ELECTRIC STARTING SYSTEM ...
Page 377: ...8 22 CHARGING SYSTEM ...
Page 393: ...8 38 SIGNALING SYSTEM ...
Page 399: ...8 44 COOLING SYSTEM Replace the ECU and or meter as sembly ...
Page 405: ...8 50 FUEL PUMP SYSTEM ...
Page 414: ...8 59 GRIP WARMER SYSTEM for XP560D OK Replace the meter assembly ...
Page 415: ...8 60 GRIP WARMER SYSTEM for XP560D ...
Page 421: ...8 66 SEAT HEATER SYSTEM for XP560D ...
Page 427: ...8 72 SMART KEY SYSTEM Replace the remote control unit ...
Page 485: ...9 11 SYSTEM DIAGRAM ...
Page 682: ......
Page 683: ......
Page 684: ......